Former Refinery Superfund
Colorado City, TX
Groundwater Remediation
Greensboro, NC
Stormwater Basin Remediation
Port Arthur, TX
Groundwater Remediation
Enid, OK
Remediation and Demolition
Big Spring, TX
Refinery Demo and Remediation
Mount Pleasant, TX
Refinery Pond Stabilization
New Brunswick, Canada
Ecological Preserve Dev
Colorado City, TX
Pond Sediment Stabilization
Colon, Panama
Colorado City, TX
Groundwater Remediation
Greensboro, NC
Stormwater Basin Remediation
Port Arthur, TX
Groundwater Remediation
Enid, OK
Remediation and Demolition
Big Spring, TX
Refinery Demo and Remediation
Mount Pleasant, TX
Refinery Pond Stabilization
New Brunswick, Canada
Ecological Preserve Dev
Colorado City, TX
Pond Sediment Stabilization
Colon, Panama
This photo gallery requires the Flash Player plugin and a web browser with JavaScript enabled.
Stormwater Basin Remediation/Stabilization
Location: Operating Refinery in Port Arthur, TXProject Value: $6.7 Million
LWR was contracted by a major oil refiner to stabilize impacted soil and previously stabilized sediment in an area formerly occupied by a stormwater retention basin. The basin had been closed under Standard 3 of the TCEQ Risk Reduction Rules beginning in 1994. Besides sludge previously stabilized in situ, the basin also contained sludge and sediment from an Aeration Basin and impacted soils from various other areas of the refinery. The impacted material within the basin was capped with a clay layer, geotextile and limestone rock. This work was completed in 2001. Soft materials placed in the basin eventually created maintenance issues and refinery expansion plans drove the refinery to reclaim this area by removing and treating materials within the basin and berms to meet Standard 2 of TCEQ Risk Reduction Rules.
The initial project scope called for stabilization of 145,000 cubic yards of impacted material from the basin. Stabilization operations on this site utilizing LWR’s cold mix pugmill units adding a reagent admixture commenced in late 2007. The efficiency of LWR’s process led to an expansion of the project scope as the client delivered additional impacted materials from the refinery property for processing. At the completion of the project in early 2009, LWR had produced 347,000 tons of recycled product that was utilized as select fill for new construction projects at the facility. Recycled product was also utilized by LWR to construct perimeter berms and a cap to close the former basin area in accordance with Standard 2. By reducing the amount of purchased engineered fill from off-site sources, the refinery estimated that the recycled product reduced construction costs by greater than $6MM.
This project is an excellent example of achieving Sustainable Remediation Goals as it reclaimed 12 acres of refinery property for construction. Compared with offsite disposal of the material that was recycled, the project conserved 684,000 gallons of diesel fuel and 280,000 cubic yards of virgin offsite soil. Onsite recycling also eliminated over 3,000,000 trucking miles and 7,600 tons of CO2 emissions associated with offsite options. LWR’s ex situ stabilization process consistently produced a recycled material that met Standard 2 Risk Reduction criteria and construction geotechnical objectives. The recycled product became the preferred select fill material for the refinery’s expansion project civil construction contractors.