
Former Refinery Superfund
Colorado City, TX
Groundwater Remediation
Greensboro, NC
Stormwater Basin Remediation
Port Arthur, TX
Groundwater Remediation
Enid, OK
Remediation and Demolition
Big Spring, TX
Refinery Demo and Remediation
Mount Pleasant, TX
Refinery Pond Stabilization
New Brunswick, Canada
Ecological Preserve Dev
Colorado City, TX
Pond Sediment Stabilization
Colon, Panama
Colorado City, TX
Groundwater Remediation
Greensboro, NC
Stormwater Basin Remediation
Port Arthur, TX
Groundwater Remediation
Enid, OK
Remediation and Demolition
Big Spring, TX
Refinery Demo and Remediation
Mount Pleasant, TX
Refinery Pond Stabilization
New Brunswick, Canada
Ecological Preserve Dev
Colorado City, TX
Pond Sediment Stabilization
Colon, Panama
This photo gallery requires the Flash Player plugin and a web browser with JavaScript enabled.
Demo and Remediation at Former Refinery Site
Location: Dorchester Refining Company Site - Mount Pleasant, TXProject Value: Est. $15.0 Million at completion
Abatement and demolition of above ground structures including process units, buildings, storage tanks, piping and foundations is ongoing with completion anticipated in early 2010. 14 separate waste management units have been identified and sampled outside of the plants process unit. Soil remediation work in these areas will involve excavation and ex situ stabilization/recycling of at least 150,000 cubic yards of impacted soil utilizing LWR’s proprietary equipment. Project objectives are to remediate all soils at the site to meet Tier 1 PCL Standards for commercial/industrial sites under TRRP so that the site can be redeveloped for industrial use.
Excluding asbestos abatement and related scaffolding work, LWR is performing all work at this site with its own personnel and owned equipment keeping project costs to a minimum. All contaminated soil on the site will be treated to meet TRRP standards so that it can be reused on the site. All metal and equipment at the facility will be salvaged with proceeds refunded to the site owner. All recovered liquids at the site are being recycled as fuel. All concrete will be crushed and recycled. The only waste materials leaving the project site for landfill disposal are asbestos containing materials (ACM), drummed waste, treated wood and general trash.